Archive Mastering - a Northward FTB build recap (vol. 11)

Archive Mastering, July 2018. I have to pinch myself everyday when I walk in here.

Credits

Design and acoustic engineering: Thomas Jouanjean, Northward Acoustics

Exterior shell construction: Frank Wiegert Construction Ltd.

Interior shell and acoustics construction: Brannen Craftsmen Ltd. - John Brannen, Ron Murphy, Jamie Muise

Audio and Network Wiring Design Assistance: Graeme Campbell

I cannot say enough good things about all of those above who helped make this project a reality. A million thanks!

Next
Next

Archive Mastering - a Northward FTB build recap (vol. 10)