Archive Mastering - a Northward FTB build recap (vol. 3)

The first of three concrete pours.

Second concrete pour, which is a raised curb all around the perimeter. This will hold the outer shell of the building.

Previous
Previous

Archive Mastering - a Northward FTB build recap (vol. 4)

Next
Next

Archive Mastering - a Northward FTB build recap (vol. 2)