Archive Mastering - a Northward FTB build recap (vol. 6)
Inner shell framing continues, and numerous layers of OSB, drywall, and asphalt damping go up on the inner shell walls and ceiling. The super heavy bulkhead separating the lounge from the mastering room goes up. Exterior glass gets installed and we get an exciting first look and feel for the view.